A preliminary meeting on 7th CPC was held at OFB today (26/02/2014) with representatives of recognized federations and Associations

All the Federations and Associations stated that the memorandum regarding 7th CPC from federations and Associations would be submitted after the release of the Term of Reference of 7th CPC 

GS/NDGBGOA pointed out the following issues needs to be considered and settled.

  • First Cadre Restructuring and SRO of Group-B Gazetted Cadre, which is the most deprived cadre in OFB, should be finalized at DOPT.Such that this cadre will not suffer in 7th CPC at least.

  • As Group-B  Gazetted is the most affected cadre in all CPC’s special care should taken atleast in 7th CPC

Snips of the meeting

1.      
  1. FITMENT TABLE for CM - 6500 X 1.86 and 7450 x 1.86 should be settled before 7th CPC
  2. International LTC should be provided to all Government Employees once in service which was welcomed by OFB and all representatives
  3. Annual Increment should be 10%
  4. CCL may be extended for widower also
  5. As fuel cost is almost same in all cities, TPT ,HRA and other allowances for employees in hard station should be granted at par with A1 cities which will attract employees to hard station and in turn boost rural development.
  6. Irrespective of cadre, risk allowance may be granted to all employees (who handle detonative substances) 
  7. 10 days encashment may be granted for all LTC‘s  
  8. PLB/Incentive should be granted to all cadre those who are not earning piece work profit
  9. Maximum limit on accumulation of EL and maximum limit of EL for encashment at the time of retirement as well as benefit of surrender of EL for encashment purpose may be increased as 400 days.


Other cadre related points


  • UPSC has cleared 183 Promotion from JWM to AWM
Engg-92, Chemical –55, NT/OTS- 15,Leather Tech-2, Clothing Tech-2 and remaining others
OFB will clear it with in 2 months

  • Promotion from CM to JWM
Mech-209, NT/OTS- 54,NTS-16

·        Proposal to increase the JWM/NT (466) is underway which may make total 888 in JWM/NT

·        Transfer of JWM’s (Compassionate and Medical grounds)
Total 120 cases to be cleared in phased manner
In first phase 35 to 40 will be cleared soon 
Remaining will be cleared with in a month